A foundation stone laying ceremony was hosted for a village church in Guangdong.
During the ceremony held on November 11, Rev. Lei Yuming, executive vice-president of Guangdong TSPM, preached a sermon titled "A House of Prayer for All Nations", for Mumian Church in Xuwen County, Zhanjiang, which is 18 kilometers away from the county seat, according to CCC&TSPM.
Built in 1929, after experiencing many changes, the village church was constructed as a thatched house covering a construction area of 720 square meters (0.178 acres) and a hall area of 90 square meters (0.022 acres). In 1993, the government implemented the policy to restore the church, and the township government returned the property and land to the church. However, due to disrepair for a long time, it become dilapidated and couldn’t open for worship. For the safety of believers, another iron shed was built for gatherings.
Now, after years of fundraising, the church has collected more than 200,000 yuan and is planning to build a two-story church with a total area of 290 square meters (0.072 acres).
- Translated by Abigail Wu
广东省湛江市徐闻县基督教木棉堂坐落在离县城18公里处的小山村,2021年11月11日,基督教木棉堂举行新堂奠基礼。
广东省基督教协会常务副会长雷玉明牧师证道《为万民祷告的殿》。
木棉堂是一间农村小教堂,始建于1929年,几经沧桑,原址有土地面积720平方米,会堂面积为90平方米的茅房。1993年政府落实政策恢复木棉堂,乡政府将房屋及场地还给教会。可由于年久失修,已成危房,不能再礼拜聚会。为了信徒生命安全,另搭铁棚聚会。
如今,信徒经过多年筹集,有建堂资金20多万元,计划建一间高两层,总面积290平方米的教堂。
https://www.gospeltimes.cn/article/index/id/59306
广东省湛江市徐闻县基督教木棉堂新堂奠基
A foundation stone laying ceremony was hosted for a village church in Guangdong.
During the ceremony held on November 11, Rev. Lei Yuming, executive vice-president of Guangdong TSPM, preached a sermon titled "A House of Prayer for All Nations", for Mumian Church in Xuwen County, Zhanjiang, which is 18 kilometers away from the county seat, according to CCC&TSPM.
Built in 1929, after experiencing many changes, the village church was constructed as a thatched house covering a construction area of 720 square meters (0.178 acres) and a hall area of 90 square meters (0.022 acres). In 1993, the government implemented the policy to restore the church, and the township government returned the property and land to the church. However, due to disrepair for a long time, it become dilapidated and couldn’t open for worship. For the safety of believers, another iron shed was built for gatherings.
Now, after years of fundraising, the church has collected more than 200,000 yuan and is planning to build a two-story church with a total area of 290 square meters (0.072 acres).
- Translated by Abigail Wu
Guangdong Village Church Reconstruction Kicks Off